
81
About this chapter
Chapter 13
Verifying settings by secondary
injection
Chapter 13 Verifying settings
by secondary
injection
About this chapter
This chapter describes how to verify that the protection functions operates correctly according
to the settings. Only the tested function should be in operation.
Summary of Contents for REB 551-C3*2.5
Page 9: ...Contents ...
Page 21: ...12 Introduction to the installation and commissioning manual Chapter 1 Introduction ...
Page 27: ...18 Note signs Chapter 2 Safety information ...
Page 53: ...44 Installing the 56 64 kbit data communication cables Chapter 5 Installing the terminal ...
Page 59: ...50 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...
Page 147: ...138 Repair support Chapter 16 Fault tracing and repair ...