Fault tracing
63
Installation problems
Verify all the connections on the module:
• Check that the ControlNet cables are connected to the BNC
connectors as described in chapter
Electrical installation
.
• Check that the RCNA-01 module is properly inserted into the
option slot.
• Check the fastening of the RCNA-01 module with the 2 screws.
Drive setup
The fieldbus parameter group is not shown on the panel:
• Enable the RCNA-01 by setting the appropriate drive
parameter.
The RCNA-01 is using default values:
• Verify that the fieldbus parameter group is set up correctly. If so,
turn off and on the power to the drive or issue a ‘Fieldbus
Adapter parameter refresh’ command. This will make the
module re-read its setup parameters.
Module
st
atu
s
GREEN
Steady
- Link functional
GREEN
Flashing
- Waiting for PLC connection
RED
Steady
- Link lost permanently.
RED
Flashing
- Link lost temporarily
Name Colour
Function
Channel A
Host Indication
Channel B
Module
status
Summary of Contents for RCNA-01
Page 1: ...ABB Drives User s Manual ControlNet Adapter Module RCNA 01 ...
Page 2: ......
Page 4: ......
Page 6: ...Safety instructions 6 ...
Page 9: ...Table of contents 9 Technical data 65 RCNA 01 65 Fieldbus link 66 ...
Page 10: ...Table of contents 10 ...
Page 14: ...Introduction 14 ...
Page 20: ...Mechanical installation 20 ...
Page 32: ...Programming 32 ...
Page 60: ...Communication 60 ...
Page 67: ......