Energy Storage
Test discharge
S
1 year
Battery balance check
S
6 months
Ultracapacitor MK1 energy storage balance check
S
1 year
Ultracapacitor MK2 energy storage balance check
S
5 years
Ultracapacitor MK2 energy storage enclosure LEDs
I
1 year
Float charger LEDs
I
1 year
Note:
For critical applications and applications where there is the possibility of poor environmental conditions
it is recommended to shorten the above recommended periods.
Schedule of component replacement for product operation in environmental conditions up to 40° C
Years from start-up
Component
Note
5
10
15
Cooling
PCS100 Inverter module fans
R
Utility Disconnect fans
R
R
R
Ultracapacitor ES door Fans
R
R
R
Float Charger Fans
R
R
R
Aging
CANbus cable replacement*
R
R
AC filter capacitors *
R
R
Auxiliary
module
power
supply
R
R
R
SCM board
SCM rev F and earlier, systems built before 18/6/2015
R
R
SCM board battery
SCM rev G and later, systems built after 18/6/2015
R
R
PCS100
module
display
board
R
R
Schedule of component replacement for product operation in environmental conditions up to 30° C
Years from start-up
Component
Note
5
10
15
Cooling
PCS100 Inverter module fans
R
Utility Disconnect fans
R
R
R
Ultracapacitor ES door fans
R
R
R
Float charger Fans
R
R
R
Aging
CANbus cable replacement*
R
R
AC filter capacitors **
R
R
Auxiliary
module
power
supply
systems built before 31/7/2017
R
R
R
Auxiliary
module
power
supply
systems built after 31/7/2017
R
R
SCM board
SCM rev F and earlier, systems built before 18/6/2015
R
R
SCM board battery
SCM rev G and later, systems built after 18/6/2015
R
R
PCS100
module
display
board
R
R
Summary of Contents for PCS100 UPS-I