38
MOU NTI NG A N D OPE R ATI ON M A N UA L
I N D O O R A I R S W I TC H - D I S CO N N EC TO R , N A L /N A L F/ V R
—
62 The installation starts with the earthing switch in
open position.
—
64 Holdfast screw must be tightened from the
flat side of auxiliary switch shaft.
—
65 The shackle (connecting part with a hole) is mounted on the
extension shaft of earthing switch so that the rod connecting
the arm of auxiliary switch with shackle is slightly strained
—
63 The arm of auxiliary switch should be at an angle
45-50 degrees in direction of earthing switch
—
66 Tighten the screws (M5) that mount the shackle
on extension shaft of earthing switch
—
67 Tighten the screws (M5) that mount the shackle
on extension shaft of earthing switch
shakle