2 Installation and commissioning
2.5.11. Installation of cooling fan for motors, axes 1-3 (option)
97
3HAC022033-001 Revision: E
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
Installation, separate fan cabling axis 1 or 2
The procedure below details how to install the separate cabling for the cooling fan of axis 1
or 2.
Action
Note
1. Move the robot to its calibration position.
Shown in section
scales and correct axis position on
page 374
2.
DANGER!
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
3. Remove the
rear cover plate
from the robot base. Shown in the figure
4. Remove the cable bracket (A)
Shown in the figure
cabling for axis 1 or 2 on page 96
5. Fit the
plate for customer connections
, if not
already fitted, to the connection plate of the robot
base.
Shown in the figure
customer connections, at base on
page 95
Art. no. is specified in
6. Run the cabling up through the base and frame,
beneath the balancing device.
Continued
Continues on next page