![ABB IRB 7600 - 500/2.55 Product Manual Download Page 318](http://html1.mh-extra.com/html/abb/irb-7600-500-2-55/irb-7600-500-2-55_product-manual_3686220318.webp)
4 Repair
4.6.3. Replacement of motor, axis 3
3HAC022033-001 Revision: E
316
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
4.
NOTE!
Keep the old
top cover
with the air nipple
mounted.
5. Continue removal of the motor unit, according to
step 6 and forwards in section
.
6. Fill the four screw recesses on the new motor with
Sikaflex. (After hardening, Sikaflex can be formed
with a knife)
xx0600002875
•
A: Motor unit
•
B: Sikaflex in screw
recesses
7. Continue to refitt the new motor according to
.
8. Perform a leak test according to
hoses (Foundry Prime) on page 176
Action
Note
Continued