
Note
Action
CAUTION
Always cut the paint with a knife and grind
the paint edge when disassembling parts.
See
Cut the paint or surface on the robot
before replacing parts on page 201
3
See the figure in:
•
Location of the cable harness on
page 205
Remove the
bracket
securing the cable
package to the frame.
4
See the figure in:
•
Location of the cable harness on
page 205
Cut the
cable straps
securing the cable
harness to the frame and lower arm.
5
A
C
E
F
B
D
xx1200000886
A Tape
B Connectors to SMB unit and Brake
release unit
C R1.CP/CS
D Air hose
E R1.MP
F R1.SMB (Connector bent and taped
upwards)
Prepare the end of the cable package in the
base with tape as shown in the figure.
Tip
In order to protect the connectors from
getting residual grease on the cable har-
ness, put some plastic over them prior to
pushing it through the hole in the frame.
6
Pull out the cable package through the hole
in the frame.
Note
Use caution when performing this proced-
ure in order not to damage cables or other
components!
7
How to remove the cable package from
the lower arm and armhouse is described
in section:
•
Removing cable harness in lower
arm and armhouse on page 214
Continue the removal of the cable package
from the lower arm and armhouse.
8
Continues on next page
Product manual - IRB 4600 Foundry Prime
213
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.1 Removing the complete cable harness
Continued
Summary of Contents for IRB 4600 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Page 106: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 398: ...This page is intentionally left blank ...
Page 400: ...This page is intentionally left blank ...
Page 406: ......
Page 407: ......