
CAUTION
Always cut the paint with a knife and grind the paint edge when disassembling
parts. See
Cut the paint or surface on the robot before replacing parts on page 201
Removing SMB battery
Use this procedure to remove the SMB battery.
Note
Action
This is done in order to facilitate
the updating of the revolution
counter.
Move the robot to its calibration position.
1
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
to the robot, before entering the robot working area.
2
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit please read the safety information in the section
The unit is sensitive to ESD on page 31
3
CAUTION
Always cut the paint with a knife and grind the paint
edge when disassembling parts. See
or surface on the robot before replacing parts on
page 201
.
4
See the figure in
Remove the
SMB battery cover
.
CAUTION
Clean cover from metal residues before opening.
Metal residues can cause shortage on the boards
which can result in hazardous failures.
5
See the figure in
Pull out the
SMB battery
.
6
See the figure in
Disconnect the
battery cable
and remove the bat-
tery.
7
How to dispose of the used SMB battery, see
chapter
8
Continues on next page
188
Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
3 Maintenance
3.5.8 Replacing SMB battery
Continued
Summary of Contents for IRB 4600 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 4600 Foundry Prime ...
Page 106: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 398: ...This page is intentionally left blank ...
Page 400: ...This page is intentionally left blank ...
Page 406: ......
Page 407: ......