![ABB IRB 360 Product Manual Download Page 59](http://html.mh-extra.com/html/abb/irb-360/irb-360_product-manual_5042059.webp)
Required equipment and references
Note
Spare part no.
Equipment
Spirit level
Shim
Chemical bolts or mechanical
expanding bolts.
Standard tools
References
Pre-installation procedure on page 43
Orienting and securing
Note
Action
Make sure the installation site for the robot con-
forms to the specifications in section
1
Prepare the installation site.
2
Use shim for leveling. Example of
shim shown in
Use a water level to level the robot frame.
3
Use chemical or mechanical ex-
pander bolts.
Secure the robot frame to the floor.
4
Shim drawing
Example of shim.
xx0700000623
Product manual - IRB 360
59
3HAC030005-001 Revision: Z
© Copyright 2008-2021 ABB. All rights reserved.
2 Installation and commissioning
2.4.4 Orienting and securing the robot frame
Continued
Summary of Contents for IRB 360
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 266: ...This page is intentionally left blank ...
Page 268: ...This page is intentionally left blank ...
Page 271: ......