3.3.7 Upper arms
General
This section describes maintenance on the upper arms, with the interval 4000
hours.
DANGER
Turn off all electrical power, hydraulic and pneumatic pressure supplies before
entering the workspace of the manipulator.
Also read the safety sections:
•
Pneumatic or hydraulic related hazards on page 32
•
•
Maintenance and repair on page 34
Check upper arm
A
B
xx0700000501
Upper arm tube
A
Joint balls
B
Continues on next page
Product manual - IRB 360
109
3HAC030005-001 Revision: Z
© Copyright 2008-2021 ABB. All rights reserved.
3 Maintenance
3.3.7 Upper arms
Summary of Contents for IRB 360
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 266: ...This page is intentionally left blank ...
Page 268: ...This page is intentionally left blank ...
Page 271: ......