![ABB IRB 140 Product Manual Download Page 91](http://html.mh-extra.com/html/abb/irb-140/irb-140_product-manual_4435091.webp)
Note
Action
A
B
xx1700000422
The upper edge of the oil plug hole
A
Oil level
B
Measure the oil level at the oil plug hole.
Required oil level:
•
34 ±5 mm below the upper edge of
the oil plug hole.
Note
Position the axis according to illustration
before measuring the oil level.
4
See
Technical reference manual - Lubric-
ation in gearboxes
Add oil if required.
5
Tightening torque:
•
10 Nm
Refit the oil plug, filling.
Note
Before refitting the oil plug in the gearbox,
always replace the oil plug sealing washer
with a new one. If not there is a risk of
leakage.
6
Seal and paint the joints that have been
opened. Also repair possible damages of
the special Foundry Prime paint coat of the
robot. See
Cut the paint or surface on the
robot before replacing parts on page 118
.
Note
After all repair work, wipe the robot free
from particles with spirit on a lint free cloth.
7
Product manual - IRB 140
91
3HAC027400-001 Revision: V
© Copyright 2004-2018 ABB. All rights reserved.
3 Maintenance
3.3.4 Inspecting oil level gearbox axis 1
Continued
Summary of Contents for IRB 140
Page 1: ...ROBOTICS Product manual IRB 140 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 214: ...This page is intentionally left blank ...
Page 228: ...This page is intentionally left blank ...
Page 230: ...This page is intentionally left blank ...
Page 244: ...This page is intentionally left blank ...
Page 250: ......
Page 251: ......