HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
59
of
128
5. Tighten the bolt with a tightening torque of 147.51 ft-lb.
6. Remove the swivel eye bolts or lifting loops (A).
7. Place the cover caps (B) in the holes (4x).
5.5.2. Open the door of the Power Cabinet
Preconditions:
Key that were removed from the Power Cabinet (bag with parts).
1. Unlock the handle (B)
2. Use the handle (B) to open the door (A).