HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
72
of
128
DC+ (marked by red heat-shrink),
DC-.
6. Tighten the nuts (C) with a tightening torque of 22.13 ft-lb.
5.7.3. Install the protection covers
1. Take the 2 protection covers that was removed in
2. Place the protection covers (B) back on the connector blocks (A).
5.8. Connect AC utility power, Interlock and CAN cables Power Cabinet
Preconditions:
Tools: wire cutter, wire stripper pliers, screwdriver, ferrules, crimp pliers.
DANGER
Make sure that the main switch of the power supply group for the product
is set to the OFF position. Do a voltage check to make sure that the
electrical power is disconnected from the system.