Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
27
4.
Loosen the draw rod nut (10):
1.
Pull the draw rod with 40 kN.
2.
Carefully increase the force until the draw
rod nut can be loosened by hand.
If 45 kN is reached, and the draw rod nut is
not loose, turn the box-spanner with a
wrench.
Refer to the instructions for the hydraulic jack.
DANGER!
Apply the hydraulic pressure carefully.
Incorrectly used high-pressure
hydraulics can break with explosive
force.
CAUTION!
Do not remove the compensation
device.
NOTE!
The draw rod is installed with a tension
of 40 kN.
G006907
5.
Loosen the nut (44).
G006809
6.
Turn the shaft (37) counter clockwise to remove the shaft-socket from the upper draw rod (35).
7.
Remove the hydraulic jack (38) from the bushing.
G006810