Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
67
7.2 Re-packing of the bushing
Overview
G000391
Procedure
1.
Put plastic wrap on the draw rod, and fix it to the transport box.
CAUTION!
Do not put the draw rod into the bushing, the threads on the draw rod will scratch the inside
of the center-tube.
2.
Lift the bushing. Refer to
Lifting the bushing out of the transport box,
page
3.
Lower the bushing into the transport box.
CAUTION!
Make sure that the there is soft bedding in the transport box.
CAUTION!
Make sure that the oil valves and test tap does not make contact with the transport box, or
other objects.
4.
Attach the bushing to the transport box in the same way as when it was delivered.
CAUTION!
Make sure that the bushing cannot move or rotate in the transport box.