11.
Remove the M10 bolts (6), the washers (7), and
the lifting tool (1).
G001935
12.
Continue with
Installation of the outer terminal,
page
End of instruction
4.5 Installation with draw rod at transformer factory
4.5.1 Removal of the lower draw rod with bottom contact from the bushing
Overview
The bottom contact is usually installed in the bushing when it is delivered from ABB, the first step at the
transformer factory is thus to remove it.
G006804
4
Lower draw rod
33 Bushing
35 Upper draw rod
36 Bottom contact