![ABB GOE(2) Installation And Commissioning Manual Download Page 77](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362077.webp)
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
77
11 Appendix
11.1 Measurement record
Overview
Record the final measurements of the draw rod.
Record
Serial number
Date
Operator
G007356
a (mm)
1
b (mm)
2
1
Draw-rod nut tightened with 10 Nm.
2
After hydraulic tightening.
Comments
Summary of Contents for GOE(2)
Page 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Page 78: ......
Page 79: ......