Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
39
2.
Connect the upper draw rod (35) to the lower
draw rod (4).
G001932
3.
Make sure that the joint is correctly threaded:
1.
Measure the distance H and compare it to
the nominal distance H.
2.
Calculate the nominal distance:
H = L - 25 mm (± 2 mm).
Refer to the rating plate for the distance L.
NOTE!
When the joint is correctly threaded,
2 threads on the upper (60) and
lower (39) threads are visible.
To get the correct draw rod length, the
ends of the draw rod parts must make
contact at (67).
G006814
4.
If the bushing has the small bottom contact, then
install the end shield:
1.
Push the end shield carefully against the
pressing ring (17), until the hex screw heads
comes through the holes in the end shield.
2.
Turn the end shield approximately 20°, to its
locked position.
G004302
Summary of Contents for GOE(2)
Page 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Page 78: ......
Page 79: ......