Maintenance 43
5. Fully pull out the fan cassette using the
handle. The fans are located on bottom
of the fan cassette attached to individual
assembly plates and with individual
cable connectors.
6. Disconnect the cable connectors of the
cooling fans.
7. Loosen the locking screws of the fan
assembly plates.
8. Carefully lift the fan assembly plates out
of the fan cassette using the keyholes in
the fan assembly plates.
9. Replace the cooling fans. Make sure
that the air flow directions is correct,
towards the roof of the inverter when the
fans are installed. Tightening torque for
the nuts is 6 N
⋅
m.