
Note
Action
Rotation tool: 3HAC7887-1
If the hole pattern is not matching, use the
rotation tool and adjust.
9
Use caution and move the arms into posi-
tion at the axis-2 gearbox on the guide pins.
10
The tightening torque depends on variant.
Secure all now accessible attachment
screws.
11
Tightening torque: 280 Nm
Remove the two guide pins and replace
with the remaining attachment screws.
12
The tightening torque depends on variant.
Secure the remaining attachment screws.
13
Tightening torque: 280 Nm
Disconnect the 24 VDC power supply.
14
Remove the lifting accessories.
15
Connecting the axis-2 motor cables
Note
Action
xx1300000738
Push the motor cables in through the cable
gland opening.
1
xx1200001067
Refit the cable gland cover.
Note
Replace the gasket if damaged!
2
Continues on next page
3HAC044266-001 Revision: -
497
© Copyright 2013 ABB. All rights reserved.
4 Repair
4.8.2 Replacing the axis-2 gearbox
Continued
Summary of Contents for DressPack IRB 6700
Page 1: ...ABB Robotics Product manual IRB 6700 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 98: ...This page is intentionally left blank ...
Page 172: ...This page is intentionally left blank ...
Page 550: ...This page is intentionally left blank ...
Page 566: ...This page is intentionally left blank ...
Page 573: ......