
Note
Action
xx1300000659
Remove the guide pins and fit the two re-
maining M12 screws.
10
M12, tightening torque: 115 Nm
Secure the remaining two M12 screws.
11
Refitting the cable harness - lower arm
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
1
xx1300000668
Tie the axis-5 and axis-6 motor cables into
bundles (if not already done), to avoid
damaging them during the continued pro-
cedure. This will also make it easier to run
the cables through the inside of the robot.
2
xx1300000733
Run the upper end of the cable harness up
through the lower arm.
3
Continues on next page
3HAC044266-001 Revision: -
321
© Copyright 2013 ABB. All rights reserved.
4 Repair
4.5.4 Replacing the lower arm
Continued
Summary of Contents for DressPack IRB 6700
Page 1: ...ABB Robotics Product manual IRB 6700 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 98: ...This page is intentionally left blank ...
Page 172: ...This page is intentionally left blank ...
Page 550: ...This page is intentionally left blank ...
Page 566: ...This page is intentionally left blank ...
Page 573: ......