Section-1
04-3006_S1_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 52/52 ABB
Modifications reserved
1.6.2 INSTALLATION CHECKLIST
All packing materials and restraints have been removed from each cabinet.
Each RI-Enclosure of the UPS system is placed in the installed location.
All conduits and cables are properly routed to the UPS and auxiliary cabinets.
All power cables are properly sized and terminated.
A ground conductor is properly installed.
If the RI-Enclosure does not use all module mounting locations, the provided protective
covers are installed on the front and back of the enclosure.
Battery cabinet installation instructions have been completed.
Air conditioning equipment is installed and operating properly.
The area around the installed UPS system is clean and dust-free. (It is recommended that
the UPS be installed on a level floor suitable for computer or electronic equipment.
Adequate workspace exists around the UPS and other cabinets.
Adequate lighting is provided around all UPS equipment.
Any optional accessories are mounted in their installed location and properly wired.
Summary alarms and/or building alarms are wired appropriately. (OPTIONAL)
Startup and operational checks performed by certified service personnel.
All network connections are completed.
Summary of Contents for DPA Upscale M 10
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......