4.1
OPERATION
4.1.1 Commissioning
The DPA UPScale
TM
is a high quality electronic machine, that must be commissioned by a fully trained and
certified field service engineer before being put into use.
The commissioning of the UPS involves the connection of the UPS and battery, the checking of the electrical
installation and operating environment of the UPS, the controlled start-up and testing of the UPS and customer
training.
WARNING!
OPERATIONS INSIDE THE UPS MUST BE PERFORMED BY A SERVICE
ENGINEER FROM THE MANUFACTURER OR FROM AN AGENT CERTIFIED BY
THE MANUFACTURER.
4.1.2 Control Panel
WARNING!
ONLY PERSONS WHICH HAVE BEEN TRAINED BY SERVICE TECHNICIANS OF
THE MANUFACTURER OR HIS CERTIFIED SERVICE PARTNERS ARE ALLOWED
TO OPERATE ON THE CONTROL PANEL WITH CLOSED DOORS.
ALL OTHER INTERVENTIONS ON THE UPS SYSTEM HAVE TO BE DONE ONLY
BY SERVICE TECHNICIANS OF THE MANUFACTURER.
The user-friendly control panel is composed of three parts:
POWER MANAGEMENT LCD DISPLAY (PMD);
LED INDICATORS;
KEYS.
Figure 1.1 Control Panel
4.1.2.1 Power Management Display (PMD)
The 2 x 20 character LCD simplifies the communication with the UPS and provides the necessary monitoring
information about the UPS. The menu driven LCD enables the access to the:
EVENT REGISTER;
Monitor the input and output U, I, f, P,
Battery runtime;
To perform commands like start-up and shut-down of UPS and
Load transfer from INVERTER to BYPASS and vice-versa;
DIAGNOSIS (SERVICE MODE);
Adjustments and testing.
Summary of Contents for DPA Upscale M 10
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......