Section-5
04-3006_S5_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 6/14 ABB
Modifications reserved
5.1.4
Load Transfer: from Maintenance Bypass to Inverter operations
This procedure describes the sequence of operations to be done in order to restart the UPS and restore ON-LINE
mode (Load on Inverter).
WARNING
!
THE OPERATIONS DESCRIBED IN THIS CHAPTER MUST BE
PERFORMED BY A SERVICE ENGINEER FROM THE MANUFACTURER OR
FROM A AGENT CERTIFIED BY THE MANUFACTURER.
Situation of UPS-System before starting the Transfer Procedure to ON-LINE mode:
The load is supplied directly by Input Mains power and the UPS is OFF.
1.
Close battery fuses/breakers in the external battery cabinets or racks.
2.
On the LCD’s: “LOAD OFF, SUPPLY FAILURE” will appear and the mimic panel will show:
LED Indicator
Colour
LINE 1
Green
LINE 2
OFF
BYPASS
OFF
INVERTER
OFF
BATTERY
Flashing/Green
3.
Press simultaneously the two ON/OFF buttons on the UPS-control panel (PMD) on all control panels
of the modules.
Unit will start-up and after about 60 seconds the mimic panel will show:
LED Indicator
Colour
LINE 1
Green
LINE 2
Green
BYPASS
Green
INVERTER
RED
BATTERY
Green
4.
Make sure that the bypass LED is green, then open the Maintenance Bypass Switch IA1 (position
OFF).
5.
Using LCD
panel, select the COMMANDS menu and choose command “LOAD TO INVERTER”. This
will transfer the LOAD to Inverter on the complete system (all units). On LCD panel “LOAD
PROTECTED” wil
l appear.
THE LOAD IS NOW SUPPLIED BY INVERTER POWER AND IS PROTECTED
Summary of Contents for DPA Upscale M 10
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......