Section-1
04-3006_S1_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 12/52 ABB
Modifications reserved
1.4.3 UNPACKING
Unpack the equipment by removing the packing and shipping materials. Make a visual inspection and check that
’Tip&Tel’ indicator ( "FRAGILE" and "ARROW") on the packing container is intact.
Perform the following steps to unpack the UPS equipment from the pallet and make sure that the floor surface is
solid and suitable for the wheeling and heavy weight:
(1)
Cut wrappers and remove packing container by pulling it upwards;
(2)
Remove the plastic cover from the UPS;
(3)
Remove pallet from the UPS;
Retain the packaging materials for future shipment of the UPS;
Examine the UPS for any sign of damage. Notify your carrier or supplier immediately if damage is
apparent.
(4a) Open the UPS-door and make sure that all the UPS-Modules are appropriately fitted in their UPS-
Compartment and if the UPS system is provided
(4b) Without a UPS-module make sure that the empty UPS-compartment is correctly covered with the UPS-
compartment protection cover.
By unpacking the equipment from the wooden case remove all screws.
Bottom screws
Sides screws
!
KG
HEAVY !
3
1
1
2
4
Summary of Contents for DPA Upscale M 10
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......