Section-5
04-3006_S5_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 11/14 ABB
Modifications reserved
In a Redundant Parallel system one module can be re-introduced on its original location without affecting
normal system operation. Load will be protected by the other modules running ON-LINE.
Module must be previously set according to system personalization. Please make sure with your nearest
service centre for correct settings.
1.
Remove the protection cover by unscrewing the two fixation screws on the front.
2.
Lift the module to its destination position. See above note concerning weights.
3.
Slide two thirds of UPS module into dedicated compartment (make sure not to plug the UPS-Module into
the rear connector).
Push UPS-module to its final position and push strongly to assure good contact on the rear plugs.
Tighten the two screws on the front of module;
4.
Check if LED LINE1 and battery is green. If yes, mains voltage is OK;
On the LCD: “LOAD OFF, SUPPLY FAILURE” will appear and the LED
-indicator will indicate as
shown below:
LED Indicator
Colour
LINE 1
Green
LINE 2
OFF
BYPASS
OFF
INVERTER
OFF
BATTERY
Flashing Green
5.
Close internal and/or external battery fuses/breaker of the new Module
6.
Press both “ON/OFF” Buttons simultaneously to start
-up UPS.
7.
Module will restart automatically connecting load to inverter and run in parallel with other ON LINE
modules. LCD panel must show LOAD PROTECTED indication.
THE LOAD IS NOW PROTECTED BY THE DPA UPScale
TM
Summary of Contents for DPA Upscale M 10
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......