Page 2
© 2021 ABB. All rights reserved.
Table of Contents
Table of Contents
································································································································
2
Table of Figures
····································································································································
4
Table of Tables
·····································································································································
6
1.
Introduction
····································································································································
7
Reference Documents
·······························································································································
7
Customer Service Contacts
·····················································································································
8
On
-
Line Power Systems Product Manuals and Software
···································································
8
2.
Product Description
·······················································································································
9
Operation
···················································································································································
9
Configurations
···········································································································································
9
Specifications
··········································································································································
10
3.
Ordering
·········································································································································
13
Ordering Codes
········································································································································
13
Lugs
··························································································································································
14
4.
Safety
·············································································································································
15
Safety Statements
···································································································································
15
Warning Statements and Safety Symbols
··························································································
18
Precautions
···············································································································································
19
5.
Pre
-
Installation
······························································································································
21
Purpose
······················································································································································
21
Audience
····················································································································································
21
Precautions
···············································································································································
21
Safety
·························································································································································
21
Installation Tools
······································································································································
21
System Identification
······························································································································
21
6.
Installing the Shelf Level Upstream Product
··············································································
23
Unpacking Shelf Level Upstream Product
··························································································
23
Installing and Powering the CP3200U Converter Shelf
····································································
23
Ground the Shelf
······································································································································
25
Attach the Load Wiring
··························································································································
25
Set Shelf ID and Attach Alarm Wiring
···································································································
27
Summary of Contents for CPS3200U
Page 1: ...Page 1 2021 ABB All rights reserved PRODUCT MANUAL ...
Page 12: ...Page 12 2021 ABB All rights reserved This page intentionally left blank ...
Page 17: ...Page 17 2021 ABB All rights reserved Figure 2 Capacitance Safety Limits ...
Page 20: ...Page 20 2021 ABB All rights reserved This page intentionally left blank ...
Page 22: ...Page 22 2021 ABB All rights reserved This page intentionally left blank ...
Page 33: ...Page 33 2021 ABB All rights reserved Step Action 2 ...
Page 34: ...Page 34 2021 ABB All rights reserved Step Action Slide the filter in to the filter bracket 4 ...
Page 43: ...Page 43 2021 ABB All rights reserved Step Action 14 ...
Page 48: ...Page 48 2021 ABB All rights reserved ...
Page 51: ...Page 51 2021 ABB All rights reserved 10 Maintenance ...
Page 52: ...Page 52 2021 ABB All rights reserved This page intentionally left blank ...
Page 62: ...Page 62 2021 ABB All rights reserved This page intentionally left blank ...