Page 9
© 2021 ABB. All rights reserved.
2.
Product Description
Figure 1 Block Diagram
-
48V Fed CPS3200U Shelf
Basic block diagram of single converter shelf System
Operation
Power comes in as
-
48V and is distributed in an A and B redundant fashion to each of the converter
cards and the alarm card. There are two +/
-
190V circuits on each converter card. The circuits both
boost the voltage and limit the current as prescribed by UL60950
-
21 and GR
-
1089
-
CORE.
Warning: Ground faults or short circuits on the output do not permanently disconnect the output. The
converter circuit tests the line every 4 seconds and will re
-
energize if the wiring fault is cleared.
A serial communication bus links each converter to an alarm card at the end of each shelf.
The alarm card provides major and minor form C contacts, manages the converters and relays
information to a ABB Power CPS6000 family controller using Galaxy Protocol over an RS485 bus. Up to
24 shelves can be controlled and monitored by one CPS6000 family controller. The CPS6000 controller
is WEB and SNMP capable.
Configurations
32 circuit, front /
-
190V shelves come in two configurations
-
airflow from bottom to top and
airflow from top to bottom. A single IP drop can be used to manage up to 24 shelves or 768 circuits.
Summary of Contents for CPS3200U
Page 1: ...Page 1 2021 ABB All rights reserved PRODUCT MANUAL ...
Page 12: ...Page 12 2021 ABB All rights reserved This page intentionally left blank ...
Page 17: ...Page 17 2021 ABB All rights reserved Figure 2 Capacitance Safety Limits ...
Page 20: ...Page 20 2021 ABB All rights reserved This page intentionally left blank ...
Page 22: ...Page 22 2021 ABB All rights reserved This page intentionally left blank ...
Page 33: ...Page 33 2021 ABB All rights reserved Step Action 2 ...
Page 34: ...Page 34 2021 ABB All rights reserved Step Action Slide the filter in to the filter bracket 4 ...
Page 43: ...Page 43 2021 ABB All rights reserved Step Action 14 ...
Page 48: ...Page 48 2021 ABB All rights reserved ...
Page 51: ...Page 51 2021 ABB All rights reserved 10 Maintenance ...
Page 52: ...Page 52 2021 ABB All rights reserved This page intentionally left blank ...
Page 62: ...Page 62 2021 ABB All rights reserved This page intentionally left blank ...