A ppENDIX A
Physical installation checklist
□
The system date is set properly using the CoreSense™ M10 web interface.
□
The thermal pump is enabled (see “Activating the thermal pump” on page 69). While the thermal
pump is disabled, the SYSTEM LED is yellow.
□
Visual inspection of the installation (oil leaks).
□
Cable glands are tight and secure.
□
The sensor head and analytical unit are properly grounded.
□
Teflon (PTFE) tape was applied on the 1.5 NPT fitting, as per “Installing the sensor head” on
page 35?
□
The proper torque was applied to secure the eight bolts on the sensor head rotating flange, as
described in “Installing the sensor head” on page 35.
□
The two bolts for the sensor head external sampling cover are secure.
□
The five retaining screws of the CoreSense enclosure are properly secured.
□
The SYSTEM, GAS, and MOISTURE LEDs are green at the back of the sensor head.
□
The green LED is lit on the analysis unit.
□
Dispose of any collected oil according to company regulations and local laws.
Summary of Contents for CoreSense M10
Page 1: ... INSTALL ATION GUIDE CoreSense M10 Multi gas monitoring system ...
Page 18: ...Page intentionally left blank ...
Page 26: ...Page intentionally left blank ...
Page 34: ...Page intentionally left blank ...
Page 42: ...Page intentionally left blank ...
Page 62: ...Page intentionally left blank ...
Page 70: ...Page intentionally left blank ...
Page 82: ...Page intentionally left blank ...
Page 88: ...Page intentionally left blank ...
Page 93: ......
Page 94: ......
Page 95: ......