Ch A p TEr 4
Installing the analytical unit
Once your installation plan is complete and you have gathered all the necessary tools, you can proceed
with installation of the CoreSense™ M10 multi-gas monitoring system.
NOTICE
The following procedures are recommendations based on best practices, but final
decisions as to the best method of installing the analytical unit belong to the technical
person in charge on site.
NOTICE
The analytical unit must be installed on a vertical or near-vertical wall (no more than 2°
from vertical).
Precautions
WARNING
Installing the CoreSense M10 multi-gas monitoring system requires at least a team of two.
WARNING
The CoreSense M10 analytical unit weighs over 65 kg (144 lb). It could cause serious
injuries or even death if it were to tip over and/or fall on someone.
Installing the mounting posts
Mounting posts are used to fix the analytical unit to a vertical surface (transformer wall or adjacent
wall). When installing the mounting posts, keep in mind that, once installed, the analytical unit
touchscreen should be at approximately eye level.
Installing the mounting posts is the first step in installing the CoreSense M10 system.
To do so:
1
Position the provided installation template flat on the wall where the analytical unit will be installed.
2
Mark the location of the eight 10 mm (0.375 in) screw holes on the wall. It is recommended that one
team member holds the installation template while another proceeds with the markings.
Summary of Contents for CoreSense M10
Page 1: ... INSTALL ATION GUIDE CoreSense M10 Multi gas monitoring system ...
Page 18: ...Page intentionally left blank ...
Page 26: ...Page intentionally left blank ...
Page 34: ...Page intentionally left blank ...
Page 42: ...Page intentionally left blank ...
Page 62: ...Page intentionally left blank ...
Page 70: ...Page intentionally left blank ...
Page 82: ...Page intentionally left blank ...
Page 88: ...Page intentionally left blank ...
Page 93: ......
Page 94: ......
Page 95: ......