Modifications reserved
Page 15/94
Perform the following steps to unpack the UPS equipment from the standard packaging:
1) and 2) Using a forklift load the unit by paying attention to the COG (see the warning above) and
bring the unit(s) close to the end position.
3) Remove the plastic film from the UPS, by cutting it on one edge (where there is the cardboard
underneath). Remove the 4x cardboard edges carefully by paying attention that the accessory box
placed on top of the UPS does not fall down. Lower the accessory box with the help of a stool or
ladder; make sure you remain safe.
4) After having placed the UPS in its final position, disassemble the left and right dedicated
transportation socket.
5) You may want to keep all packaging materials for later use.
1)
2)
3)
2)
Figure 4: Photographs of Conceptpower DPA with standard packaging
Summary of Contents for Conceptpower DPA 500
Page 1: ... Copyright 2017 ABB All rights reserved Operating manual Conceptpower DPA 500 100 500 kW ...
Page 2: ......
Page 79: ... Copyright 2017 ABB All rights reserved Appendix A Xtra VFI 3 ph UPS products ...
Page 88: ...Modifications reserved Page 88 94 Attachments Technical data sheet ...
Page 90: ......
Page 91: ... Copyright 2017 ABB All rights reserved Technical data sheet Conceptpower DPA 500 100 500 kW ...