
Electrical installation
Contents of this chapter
This chapter describes how to:
•
measure the insulation
•
do the grounding system compatibility check
•
change the EMC filter connection
•
connect the power and control cables
•
install optional modules
•
connect a PC.
Required tools
To do the electrical installation, you need the following tools:
•
wire stripper
•
screwdriver or wrench with a set of suitable bits. For motor cable terminals,
the recommended screwdriver shaft length is 150 mm (5.9 in).
•
short flat head screwdriver for the I/O terminals
•
torque wrench
•
multimeter and voltage detector
•
personal protective equipment.
6
Electrical installation 61
Summary of Contents for ACS180-04S-03A7-1
Page 1: ...ABB MACHINERY DRIVES ACS180 drives Hardware manual...
Page 2: ......
Page 4: ......
Page 12: ...12...
Page 24: ...24...
Page 84: ...84...
Page 96: ...96...
Page 146: ...146...
Page 148: ...Frame R0 148 Dimension drawings...
Page 149: ...Frame R1 Dimension drawings 149...
Page 151: ...Frame R3 Dimension drawings 151...
Page 152: ...Frame R4 152 Dimension drawings...
Page 160: ...160...
Page 180: ...Declarations of conformity 180 The Safe torque off function...
Page 181: ...The Safe torque off function 181...
Page 182: ...182 The Safe torque off function...
Page 183: ...The Safe torque off function 183...
Page 184: ...184...
Page 187: ...Installation 1 2 N m M4x16 2x 3 3 3 2 2 2 2 Accessories 187...
Page 189: ...Installation 3 3 2 2 2 3 2 2 N m M4x16 4x 1 Accessories 189...