Quick installation and commissioning flowchart
See
Task
Type designation key (page 32)
Identify the frame size: R0, R1, R2, R3 or R4.
Guidelines for planning the electrical
installation (page 43)
Plan the installation.
Check the ambient conditions, ratings and required
cooling air flow.
Unpacking the delivery (page 39)
Unpack and check the drive.
Grounding system compatibility
check (page 63)
If the drive will be connected to an IT (ungrounded)
system, make sure that the internal EMC filter is not
connected.
Installing the drive (page 40)
Install the drive mechanically.
Route the cables.
Connecting the power
cables (page 68)
Connect the power cables.
Connecting the control
cables (page 71)
Connect the control cables.
Installation checklist (page 81)
Examine the installation.
Refer to
and start-up guide
(3AXD50000510344 [English])
, and
ACS180 Firmware manual
(3AXD50000467860 [English])
.
Commission the drive.
22 Introduction to the manual
Summary of Contents for ACS180-04S-03A7-1
Page 1: ...ABB MACHINERY DRIVES ACS180 drives Hardware manual...
Page 2: ......
Page 4: ......
Page 12: ...12...
Page 24: ...24...
Page 84: ...84...
Page 96: ...96...
Page 146: ...146...
Page 148: ...Frame R0 148 Dimension drawings...
Page 149: ...Frame R1 Dimension drawings 149...
Page 151: ...Frame R3 Dimension drawings 151...
Page 152: ...Frame R4 152 Dimension drawings...
Page 160: ...160...
Page 180: ...Declarations of conformity 180 The Safe torque off function...
Page 181: ...The Safe torque off function 181...
Page 182: ...182 The Safe torque off function...
Page 183: ...The Safe torque off function 183...
Page 184: ...184...
Page 187: ...Installation 1 2 N m M4x16 2x 3 3 3 2 2 2 2 Accessories 187...
Page 189: ...Installation 3 3 2 2 2 3 2 2 N m M4x16 4x 1 Accessories 189...