Chapter 4 – Commissioning the Supply Section with ISU
4-6
ACA 635 IBGT Supply Sections
Starting
This procedure instructs how to start the IGBT supply unit.
Action
Information
WARNING!
When starting the IGBT supply unit, the DC busbars will become live, as
will all the inverters connected to the DC busbars.
Make sure that it is safe to start the IGBT supply unit. Ensure that:
• Nobody is working with the unit or circuits that are wired from outside into the
cabinets.
• All cabinet doors are closed.
• The covers of the motor terminal boxes are on.
Ensure the actions described in subsections
and
Checks with Voltage Connected to
are completed.
Be ready to trip the main breaker of the supply transformer if
anything abnormal occurs.
Close the main disconnecting switch of the auxiliary circuit.
Close the main disconnecting switch of the supply section.
Start the ISU:
• reset the starting logic by the RESET button on the cabinet
door.
• turn the starting switch on the cabinet door from position 0
to 1, and
• turn the starting switch to the START position and release
it.
Summary of Contents for ACS 600 MultiDrive
Page 4: ......
Page 8: ...Safety Instructions vi ACA 635 IGBT Supply Sections ...
Page 57: ...Chapter 7 Fault Tracing 7 8 ACA 635 IGBT Supply Sections ...
Page 99: ...Appendix B Circuit Diagrams B 2 ACA 635 IGBT Supply Sections H ...
Page 100: ...Appendix B Circuit Diagrams ACA 635 IGBT Supply Sections B 3 ...
Page 101: ...Appendix B Circuit Diagrams B 4 ACA 635 IGBT Supply Sections ...
Page 102: ...Appendix B Circuit Diagrams ACA 635 IGBT Supply Sections B 5 ...
Page 103: ...Appendix B Circuit Diagrams B 6 ACA 635 IGBT Supply Sections ...
Page 104: ...Appendix B Circuit Diagrams ACA 635 IGBT Supply Sections B 7 ...
Page 105: ...Appendix B Circuit Diagrams B 8 ACA 635 IGBT Supply Sections ...
Page 106: ...Appendix B Circuit Diagrams ACA 635 IGBT Supply Sections B 9 ...
Page 107: ...Appendix B Circuit Diagrams B 10 ACA 635 IGBT Supply Sections ...
Page 108: ......