![ABB ACQ580-34 Hardware Manual Download Page 102](http://html.mh-extra.com/html/abb/acq580-34/acq580-34_hardware-manual_2546102.webp)
■
Preparing the cable ends and making 360-degree grounding at the
cable entry
1. Peel off 3…5 cm (1 1/4 … 2 in) of the outer insulation of the cables at the cable entries
with the conductive sleeves for the 360° high-frequency grounding.
2. Prepare the ends of the cables.
PE
PE
WARNING!
Apply grease to stripped aluminum conductors before attaching them to
non-coated aluminum cable lugs. Obey the grease manufacturer’s instructions.
Aluminum-aluminum contact can cause oxidation in the contact surfaces.
3. If fire insulation is used, make an opening in the mineral wool sheet according to the
diameter of the cable.
4. Put the cables through the entry plate.
102 Electrical installation
Summary of Contents for ACQ580-34
Page 1: ... ABB DRIVES FOR WATER ACQ580 34 drive modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 14: ...14 ...
Page 24: ...24 ...
Page 50: ...50 ...
Page 60: ...60 ...
Page 70: ...70 ...
Page 94: ...94 ...
Page 110: ...110 ...
Page 122: ...122 ...
Page 132: ...Dimension drawing 132 External control unit option P906 ...
Page 140: ...140 ...
Page 144: ...144 ...
Page 164: ...164 ...
Page 184: ...Standard configuration E208 and E210 included 184 Dimension drawings ...
Page 185: ...Drive module with option B051 Dimension drawings 185 ...
Page 186: ...Drive module with options B051 H370 186 Dimension drawings ...
Page 187: ...LCL filter module Dimension drawings 187 ...
Page 190: ...190 ...
Page 208: ... Declaration of conformity 208 The Safe torque off function ...
Page 214: ...214 ...
Page 226: ...226 ...