364xS User’s Manual
12
Installation
In addition, consider the need for a testing or calibration input, and provide space for the housing cover to be
removed for electrical wiring and maintenance.
WARNING !
Process leaks may cause harm or result in death. Install and tighten process connectors and all accessories
(including manifolds) before applying pressure.
In case of toxic or other dangerous process fluid, take all precautions as recommended in the relevant
Material Safety Data Sheet when draining or venting.
Use only a 12 mm (15/32 “) hexagonal spanner to tighten the bracket bolts
Application related recommendation
Flow measurement with clean liquids or steam
(condensable vapor)
1. Place taps to the side of the line.
2. Mount the drain/vent valve upward.
3.
In case of steam application fill the vertical section
of the connecting lines with a compatible fluid
through the dedicated filling tees.
Flow measurement with gas or liquids with solids
in suspension
1. Place taps in the top of the line
2.
Mount the transmitter above the taps
gate
valves
filling
tees
Flow
3-valve manifold
Flow
3-valve manifold
line from the
back of the
manifold
Flow
3-valve manifold
line from the
bottom of the
manifold
Flow
3-valve manifold
line from the
bottom of the
manifold
Summary of Contents for 2600T Pressure Transmitter Series
Page 1: ...InstrumentationIT 2600T Pressure Transmitter family ABB User s Manual 364DS and 364PS Models ...
Page 7: ...364xS User s Manual 7 This page has been intentionally left blank ...
Page 72: ...364xS User s Manual 72 Additional Safety ...