Installation
46
Instruction manual SGS
3
is
SGS 80 to 120
5. The gas control valve has a test nipple that can be used for measuring the
supply pressure.
This test nipple has a sealing screw. Loosen the sealing screw by a few
turns. Do not completely loosen it as it can be difficult to retighten.
6. Open the gas supply and vent the gas supply line via the test nipple.
7. Connect a pressure gauge to the test nipple as soon as gas starts to flow
from it.
8. Switch on the power to the appliance using the isolator on the appliance.
9. Switch the controller
ON
by setting the 0/I switch to
position I
.
The display will now show
INTERNAL CHECK
for about 10 seconds, and
will then go to the main menu.
10. Select
SERVICE OPERATION
,
FULL LOAD
from the service menu.
11. Confirm with
.
The display shown here will appear.
The appliance is now in "Full load mode" and will ignite.
12. You must wait about 1 minute after the display shows the text
RUNNING
before reading the dynamic pressures (the fan needs this time to get up to
full speed, so that you can get a reliable reading).
INTERNAL CHECK
SERVICE MENU
SERVICE INTERVAL
»SERVICE OPERATION
È ANTI LEGIONELLA
SERVICE OPERATION
»FULL LOAD
PARTIAL LOAD
IMD-1097a R0
Summary of Contents for SGS - 100
Page 7: ...4 Instruction manual SGS gis...
Page 11: ...Contents 8 Instruction manual SGS...
Page 23: ...Working principle of the water heater 20 Instruction manual SGS 2 gis...
Page 37: ...Installation types 34 Instruction manual SGS Installation 3...
Page 57: ...Conversion to a different gas category 54 Instruction manual SGS 4 is...
Page 65: ...Draining 62 Instruction manual SGS 6 gis...
Page 71: ...Status of the water heater 68 Instruction manual SGS 8 gis...
Page 75: ...Shutting down 72 Instruction manual SGS 10 gis...
Page 103: ...Service interval 100 Instruction manual SGS 14 is...
Page 112: ...Instruction manual SGS 109 is...
Page 119: ...Instruction manual SGS 116...