Table 2 – Inspection & Maintenance Log
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Inspected By:
Inspection Date:
Component:
Inspection:
Before
Each Use
Competent
Person
Carabiners
Hooks
(Figure 8)
Inspect Snap Hooks, Carabiner, Rebar Hooks, etc. for signs of
damage, corrosion, and proper working condition. Where present:
Swivels (A) should rotate freely, and Carabiner and Hook Gates (B)
should open, close, lock, and unlock properly.
Web Lanyards
Webbing and Stitching
(Figure 9)
Inspect webbing; material must be free of cuts (A), frays (B), or
broken fibers. Check for tears, abrasions, heavy soiling (C), mold,
burns (D), or discoloration. Inspect stitching; Check for pulled or cut
stitches. Broken stitches may be an indication that the harness has
been impact loaded and must be removed from service.
Rope Lanyards
Rope and Thimbles
(Figure 10)
Inspect the rope, material must be free of frayed strands, broken
yarns, cuts, abrasions, burns, discoloration, chemical or heat damage
(indicated by brown, discolored, or brittle areas), and ultraviolet
damage (indicated by discoloration and the presence of splinters
and slivers on the rope surface). The rope must be free of knots,
excessive soiling, heavy paint buildup, and rust staining. Rope splices
must be tight, and thimbles must be held by the splice. Cracked or
distorted rope thimbles may indicate that the Rope has been impact
loaded. Damaged or questionable ropes must be removed from
service.
Labels (Figure 11)
All labels should be present and fully legible.
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Corrective Action/Maintenance:
Approved By:
Periodic examination next due
date:
Date:
Summary of Contents for PROTECTA AF725
Page 3: ...3 2 3 4 5 A B C 6 7 A B...
Page 4: ...4 8 9 10 B B B A B C D D C B A 11 13 1 3 4 9 12 10 11 2 5 6 7 8 2...
Page 14: ...14 1 0 1 1 2 1 1 2 1 3 1 4 1 A 12 kN 2 698 lbf 18 kN 4 047 lbf B 1 2 3 0 6 m 1 97 ft...
Page 18: ...2 8 Rebar 9 D 10 11...
Page 40: ...5908271 A 40 3 3 3M ANSI Z359 3 3 Top Drive Arc Flash Hot Works 3 3 EL...
Page 42: ...42 1 0 1 1 2 1 1 2 1 3 1 4 1 1 12 kN 2 698 lbf 18 kN 4 047 lbf 2 1 2 3 0 6 m 1 97 ft...
Page 46: ...2 8 9 C D 10 11...
Page 75: ...A 5908271 75 3M 3M 60 3M Fall Protection lifeline ANSI Z359 3M 3M 3M HE...
Page 79: ...79 3M 5 3 10 10 6 0 6 1 104 F 40 C 6 2 6 3 7 0 11 11 1 2 3 4 5 6 7 CE 8 9 10 11 12 13...
Page 80: ...2 8 B A 9 B A D C 10 11...
Page 109: ...5908271 A 109 3M 3M 60 96 3M ANSI Z359 3M 3M 3M KA...
Page 111: ...111 1 0 1 1 2 1 1 2 1 3 1 4 1 1 12 18 2 1 2 3 0 6 1 97...
Page 115: ...2 18 A B 9 A B C D 10 11...
Page 207: ...5908271 A 207 3M 3M 0 6 3M ANSI Z359 3M 3M 3M 3M UK...
Page 209: ...209 1 0 1 1 2 1 1 2 1 3 1 4 1 1 12 2 698 lbf 18 4 047 lbf 2 1 2 3 0 6 1 97...
Page 213: ...2 8 B 9 B D 10 11...
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......