7-FRONT FORK COMPONENT
66
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251100-248000 Disc brake oil pipe hexagon head bolt M10 × 1 × 20
4
18
~
20N.m
2
1251513-013000 Disc brake pipe copper washer φ 15× φ 10.2 × 1.5
10
3
1100100-676000 ZT310 hydraulic control unit (wet type)
1
4
1251100-112000 Disc brake pipe bolt M10×1
-
22
1
30
~
32N.m
5
1100300-044000 ZT125T front disc main pump assembly(without rocker
1
6
1134100-032000 ZT250
-
R Right handle rocker (Machine)
1
7
1224100-037000 Grade 0 flame retardant tie (black 3.6×295)
1
Fig.23 FRONT FORK
COMPONENT
ABS brake system-2
PROCEDURE:
●
Release brake fluid
Place holder to collect wasted brake fluid under the ABS hydraulic control unit.
After wearing the waterproof gloves, remove the bolts
⑴
with a 14# sleeve
,
take off the copper washer
⑵
and
4pcs oil pipes.
Afterthe brake fluid is discharged, remove the hydraulic control unit and wipe off the oil. Be careful not to let
the brake fluidcome into contact with the cable connector to prevent poor contact due to corrosion.
RC-HU is connected to the hydraulic control unit and rear brake caliper; RMC-HU is the rear disc brake main
pump; FC-HU is the front disc brake caliper; FMC-HU is the front disc brake main pump.
●
FMC-HU
The oil pipe, front disc brake main pump, rocker arm assembly and disassembly refer to the previous steps in
"Adding brake fluid and rocker arm adjustment".
CAUTION:
●
Be sure to disassemble the muffler and engine after they have cooled down completely. The horizontal support
of thevehicle should be fixed before disassembly and assembly work.
●
The precautions for brake fluid are described in the previous section.
●
It is recommended to replace the two copper washers
⑵
at the same timewhen replacing the tubing. The bolts
⑴
and (4) needn't to be replaced if they are not damaged.