41
1. Remove the needle.
2. Remove the belt cover.
3. Tilt the machine head back and remove
the timing belt
.
4. Turn the machine pulley until the
A
mark is aligned with the red dot.
5. While holding the upper shaft so that it
won't move align the mark in the lower belt
pulley
with the reference line in the arm
bed and attach the timing belt
.
6. Check the position of the
A
mark on the
machine pulley.
7. Replace the belt cover.
8. Install the needle.
1. Remove the needle.
2. Remove the belt cover.
3. Tilt the machine head back and remove
the timing belt
.
4. Turn the machine pulley until the
A
mark is aligned with the red dot.
5. While holding the upper shaft so that it
won't move align the mark in the lower belt
pulley
with the reference line in the arm
bed and attach the timing belt
.
6. Check the position of the
A
mark on the
machine pulley.
7. Replace the belt cover.
8. Install the needle.
Содержание ZJ2842-BD
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 15: ...2 ...
Страница 16: ...3 ...
Страница 17: ...4 ...
Страница 21: ...8 Kg Kg ...
Страница 23: ...10 ...
Страница 28: ...15 ...
Страница 52: ...39 ...
Страница 73: ...60 22 24 14 22 24 14 1 1 2 2 3 3 8 13 13 16 11 23 22 13 13 16 11 23 22 ...
Страница 75: ...62 2842 2872 2842 2872 4 4 5 5 6 6 2 6 2 6 13 13 16 21 2 5 13 13 16 21 2 5 32 16 25 20 21 16 25 20 21 ...