On some installations it may be desirable 

to install an independent hanger for the 

level control switches to avoid possible 

hang ups on the pumps, piping, valves, 

etc.  Float hangers are available from 

Zoeller  Company  on  Catalog  Sheet 

FM0526 or can be fabricated from stan-

dard pipe and fittings.

SUGGESTED METHODS OF FLOAT INSTALLATION

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

TYPICAL FLOAT HANGER ON STEEL COVER PITS

ACCESS COVER

STANDARD PIPE

FLANGE

PVC OR LIGHT WEIGHT

STAINLESS STEEL PIPE

PEA GRAVEL

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

10-1457 FLOAT TREE

WITH 3 FLOATS SHOWN

SK1217

SK1218

RECOMMENDED INSTALLATION FOR ALL APPLICATIONS

All installations must comply with all applicable electrical and plumbing codes, including,  but not limited to, National Electrical Code, local, regional, and/or state plumbing 

codes, etc. Not intended for use in hazardous locations.

  (1)   Electrical wiring and protection must be in accordance with National 

Electrical Code and any other applicable state and local electrical 

requirements. 

  (2)   Install proper Zoeller unicheck (combination union and check valve), 

preferably just above the basin to allow easy removal of the pump for 

cleaning or repair.  On sewage, effluent or dewatering, if high head or 

below cover installation is required use 30-0164 on 1½" pipe, 30-0152 

on 2" pipe and 30-0160 on 3" pipe.  See (4) below. 

  (3)   All installations require a basin cover to prevent debris from falling into 

the basin and to prevent accidental injury. 

  (4)   When a Unicheck is installed, drill a 3/16" dia. hole in the discharge 

pipe even with the top of the pump. NOTE: THE HOLE MUST ALSO 

BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. 

(High Head unit see #3 under “Caution” on front page). Water stream 

will be visible from this hole during pump run periods.

  (5)   Securely tape or clamp power cord to discharge pipe, clear of the float 

mechanism(s). 

  (6)  Use full-size discharge pipe. 

  (7)   Basin must be in accordance with applicable codes and 

 

specifications.

  (8)   Pump must be level and float mechanism(s) clear of sides of basin 

before starting pump.     

  (9)  Basin must be clean and free of debris after installation.

 (10)   Gate Valve or Ball Valve to be supplied by installer and installed 

 

according to any and all codes.

  (11)   Locate float switches as shown in sketches. The best place for the 

“off” point is above the motor housing and positioned 180° from the 

inlet. Never put “off” point below discharge on pump (Sewage & 

 

Effluent only). 

NOTE: FOR AUTOMATIC PUMPS, USE 

DEWATERING INSTALLATION SKETCH.

 (12)  Gas tight seals required to contain gases and odors.

 (13)     Vent gases and odors to the atmosphere through vent pipe (Sewage 

& Dewatering only).

 (14)    Install Zoeller Pump Stand (Model 10-2421) under pump to provide a  

  settling basin. (Effluent & Dewatering only.)

For Effluent Only:

 (15)     Wire pump to power through a Zoeller watertight junction box or 

watertight splice.  

NOTE: Watertight enclosure is a must in damp 

areas. See No. 8 on front page of FM0732.

                  

 (16)   Refer to SSPMA Effluent Sizing Manual for determining “on” - “off” 

switches. 

 (17)    Septic tank risers must be used for easy pump and filter access.

NOTE: Double seal pumps offer extra protection from damage caused by 

seal failure.

TYPICAL SEWAGE INSTALLATION

SK290

100 mm (4”)
OF GRAVEL

Always refer to 

FM0551 and/or 

SSPMA recom-

mended sewage 

pump installation 

and maintenance.

TYPICAL EFFLUENT INSTALLATION

SK291

WW1 
EFFLUENT
FILTER

See FM0531, 

FM0732 & FM1420 

for alarms, controls 

& junction boxes

TYPICAL DEWATERING INSTALLATION

SK292

TURN

ON

TURN

OFF

1

2

3

7

9

14

8

6

4

5

10

12

13

10 cm (4") OF GRAVEL

    MINIMUM
457mm X 610mm
 (18"X24" BASIN.)
 LARGER DEPTHS
    MAY BE 
   REQUIRED.

See FM0531, FM0732 & FM1420 for alarms, 

controls & junction boxes

Содержание 137 Series

Страница 1: ...lified licensed electrician 9 Pump installation and servicing should be performed by a qualified person 10 Risk of electric shock These pumps have not been investigated for use in swimming pool and marine areas 11 According to the state of California Prop 65 this product contains chemicals known to the state of California to cause cancer and birth defects or other reproductive harm 1 Check to be s...

Страница 2: ...ervice Stations Go to www zoellerpumps com servicestations to find the Authorized Service Station in your area SERVICE CHECKLIST EASY DO S DON T S FOR INSTALLING A SUMP PUMP 1 DO read thoroughly all installation material provided with the pump 2 DO inspect pump for any visible damage caused by shipping Contact dealer if pump appears to be damaged 3 DO clean all debris from the sump Be sure that th...

Страница 3: ...under Caution on front page Water stream will be visible from this hole during pump run periods 5 Securely tape or clamp power cord to discharge pipe clear of the float mechanism s 6 Use full size discharge pipe 7 Basin must be in accordance with applicable codes and specifications 8 Pump must be level and float mechanism s clear of sides of basin before starting pump 9 Basin must be clean and fre...

Страница 4: ...rrect switching of any two power leads other than ground should provide the proper rotation All three phase pumps require motor starting devices with motor overloadprotection SeeFM0486forduplexinstallations Pumps must be installed in accordance withtheNationalElectrical Code and all applicable local codes and ordinances Pumps are not to be installed in locations classified as hazardous in accordan...

Страница 5: ...e o las bom bas no automáticas que usan interruptores de flotador de nivel variable auxiliares es responsabi lidad del instalador y deberá verificarse que el interruptor de flotador atado no se enganchará en el aparato de la bomba ni en las peculiaridades del foso y que está fijado de manera que permita la parada de la bomba Se recomienda usar tubería y empalmes rígidos y que el foso tenga 45 cm 1...

Страница 6: ...sumidero 6 INSTALE una válvula de retención y una unión en la tubería de descarga JAMÁS use una tubería de descarga de menor tamaño que la descarga de la bomba 7 JAMÁS use una bomba de sumidero como una bomba excavadora o para zanjas ni para bombear aguas cloacales gasolina u otros líquidos peligrosos 8 PRUEBE la bomba inmediatamente después de su instalación para asegurarse de que el sistema func...

Страница 7: ...MATICAS UTILICE EL ESQUEMA PARA LA INSTALACION PARAACHIQUE MÁS ABAJO 12 Los sellos herméticos contra gases son necesarios en todas las instalaciones de aguas cloacales a fin de contener los gases y olores 13 Ventile los gases y olores a la atmósfera a través del tubo de ventilación sólo para cloaca y achique 14 Instale el soporte para bomba Zoeller Modelo 10 2421 debajo de la bomba para proporcion...

Страница 8: ... posee un tomacorriente de este tipo se debe cambiar por uno apropiado cableado y con puesta a tierra de acuerdo al Código Eléctrico Nacional y a todas las ordenanzas y códigos locales aplicables ADVERTENCIA Riesgo de choque eléctrico No quite el cable de alimentación eléctrica ni el dispositivo de alivio de tensión y no conecte un conductor directamente a la bomba ADVERTENCIA La instalación y ver...

Страница 9: ...oits classifiés à risque conformément à la norme ANSI NFPA 70 du Code national américain de l électricité 7 Risque d électrocution Ne pas enlever le cordon d alimentation ni le distributeur de tension mécanique ni brancher le conduit directement à la pompe 8 L installation et la vérification de l équipement électrique doivent être faites par un électricien qualifié 9 L installation et la vérificat...

Страница 10: ...oir d autres droits qui varient d une province à l autre GARANTIE LIMITÉE Le fabricant garantit à l acheteur et au propriétaire ultérieur pendant la période de garantie tout produit neuf contre tout vice de matériel et de main d œuvre en utilisation normale et quand utilisé et entretenu correctement pendant une période de 3 ans de la date de fabrication initiale Les pièces devenant défectueuses pe...

Страница 11: ...r un tuyau de refoulement de pleines dimensions 7 Le puits doit être conforme à tous les règlements applicables 8 Avant la mise en service la pompe doit être de niveau et le mécanisme du flotteur ne doit pas toucher les bords du puits 9 Après l installation le puits doit être propre et ne doit pas contenir de débris 10 L installateur doit fournir la vanne d arrêt et l installer en respectant tous ...

Страница 12: ...nu dans les limites appropriées Remarque Le câble doit être installé horizontalement Longueur du bras d attache Plage de pompage 5 10 15 20 22 9 13 5 18 22 24 5 po min 22 po max SK305 Interrupteur 20 amps modèles WD et WH min max 011835 VERT NOIR MOTEUR BLANC COMMUTATEUR DE FLOTTEUR BLEU ROUGE JAUNE NOIR EXÉCUTENT DÉMARRENT NOIR BLANC CONDENSATEUR DE PASSAGE BLEU BLANC ROUGE BRUN O L Instructions ...

Отзывы: