background image

1

© Copyright 2011 Zoeller Co. All rights reserved.

INSTALLATION INSTRUCTIONS

RECOMMENDED MODELS

P/N 151797

Notice to installing contractor:  Instructions must remain with installation.

SECTION: 6.10.002

FM2676

1011

Supersedes

New

PREINSTALLATION CHECKLIST - ALL INSTALLATIONS

DATE INSTALLED:

MODEL NUMBER:

1.   Inspect your pump. Occasionally, products are damaged during shipment.  If the unit is damaged, contact your dealer before using. DO NOT remove the test plugs in the cover nor the motor housing.

2.   Carefully read the literature

 provided to familiarize yourself with specific details regarding installation and use. These materials should be retained for future reference.

NOTICE: VENT HOLE FOR

CHECK V

ALVE

SEE #3 IN CAUTION SECTION

BELOW 

AND #4 ON P

AGE 3

EFFLUENT*/SUMP/DEWATERING SEWAGE

49 / 53 / 57 Series, 98 Series

264 Series

137 Series, 151 / 152 / 153 Series

266 / 267 /  268 Series

CAUTION

SEE BELOW FOR

LIST OF CAUTIONS

SEE BELOW FOR

LIST OF WARNINGS

  1.

   Make certain that the receptacle is within the reach  of the pump’s power supply cord.  DO NOT 

USE AN EXTENSION CORD. Extension cords that are too long or too light do not deliver sufficient 

voltage to the pump motor. But, more important, they could present a safety hazard if the insulation 

were to become damaged or the connection end were to fall into the sump.

  2.   Make sure the pump electrical supply circuit is equipped with fuses or circuit breakers of 

proper capacity.  A separate branch circuit is recommended, sized according to the “National 

Electrical Code” for the current shown on the pump nameplate.

  3.   Testing for ground.   As a safety measure, each electrical outlet should be checked for ground 

using an Underwriters Laboratory Listed circuit analyzer which will indicate if the power, neutral and 

ground wires are correctly connected to your outlet.  If they are not, call a qualified licensed electrician.

  4.   For Added Safety.  Pumping and other equipment with a 3-prong grounded plug must be connected 

to a 3-prong grounded receptacle. For added safety the receptacle may be protected with a ground-

fault circuit interrupter. When a pump needs to be connected in a watertight junction box, the plug 

can be removed and spliced to the supply cable with proper grounding. For added safety this circuit 

may be protected by a ground-fault circuit interrupter. The complete installation must comply with 

the National Electrical Code and all applicable local codes and ordinances.

  5.  FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE 

HANDLING.  Single phase pumps are supplied with a 3-prong grounded plug to help protect you 

against the possibility of electrical shock.  DO NOT UNDER ANY CIRCUMSTANCES REMOVE 

THE GROUND PIN.

  The 3-prong plug 

must be inserted into a mating 3-prong grounded receptacle.  

If the installation does not have such a receptacle, it must be changed to the proper type, wired 

and grounded in accordance with the National Electrical Code and all applicable local codes and 

ordinances.  Three phase pumps require motor starting devices with motor overload protection. See 

FM0486 for duplex installations.

  6. 

The tank is to be vented in accordance with local plumbing code.  Pumps

 must be installed in 

accordance with the National Electrical Code and all applicable local codes and ordinances.  Pumps 

are not to be installed in locations classified as hazardous in accordance with National Electrical 

Code, ANSI/NFPA 70.

  7.  “Risk of electrical shock”  Do not remove power supply cord and strain relief or connect conduit 

directly to the pump.

  8.

  Installation and servicing of electrical circuits and hardware should be performed by a qualified 

licensed electrician.

  9.

  Pump installation and servicing  should be performed by a qualified person.

 10.

  Risk of electric shock - These pumps have not been investigated for use in swimming pool and 

marine areas.

 11.

  According to the state of California (Prop 65), this product contains chemicals known to the state 

of California to cause cancer and birth defects or other reproductive harm.

  1.

  Check to be sure your power source is capable of handling the voltage requirements of the motor, 

as indicated on the pump name plate.

  2.

  The installation of automatic pumps with variable level float switches or nonautomatic pumps using 

auxiliary variable level float switches is the responsibility of the installing party and care should be 

taken that the tethered float  switch will not hang up on the pump apparatus or pit peculiarities and 

is secured so that the pump will shut off.  It is recommended to use rigid piping and fittings and the 

pit be 18" or larger in diameter.

  3.  Information - vent hole purpose.

  It is necessary that all submersible sump, effluent, and sewage 

pumps capable of handling various sizes of solid waste be of the bottom intake design to reduce 

clogging and seal failures.  If a check valve is incorporated in the installation, a vent hole (approx. 

3/16") must be drilled in the discharge pipe below the check valve and pit cover to purge the unit 

of trapped air. Trapped air is caused by agitation and/or a dry basin.  Vent hole should be checked 

periodically for clogging.  The 53 / 57, and 98 Series pumps have a vent located in the pump housing 

opposite the float, adjacent to a housing lug, but an additional vent hole is recommended.  The vent 

hole on a High Head application may cause too much turbulence. You may not want to drill one. 

If you choose not to drill a vent hole, be sure the pump case and impeller is covered with liquid 

before connecting the pipe to the check valve and no inlet  carries air to the pump intake. 

NOTE: 

THE HOLE MUST ALSO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY.

 Water 

stream will be visible from this hole during pump run periods.

  4.

  Pump should be checked frequently for debris and/or build up which may interfere with the float “on” 

or “off” position. Repair and service should be performed by Zoeller Pump Company Authorized 

Service Station only.

  5.

  Dewatering and effluent sump pumps are not designed for use in pits handling raw sewage.

  6.

  Maximum operating temperature for standard model pumps must not exceed 130°F (54°C).  

  7.  Pump models 266, 267, 268, and 137 must be operated in an upright position. Do not attempt to 

start pump when tilted or laying on its side.

  8.

  Do not operate a pump in an application where the Total Dynamic Head is less than the minimum 

Total Dynamic Head listed on the Pump Performance Curves.

REFER TO WARRANTY ON PAGE 2.

NOTE: Pumps with the “UL” mark and pumps with the “US” mark are tested to UL Standard UL778. 

CSA Certified pumps are certified to CSA Standard C22.2 No. 108.

Product information presented 

here reflects conditions at time 

of  publication. Consult factory 

regarding discrepancies or 

inconsistencies.

MAIL TO:

  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO:

  3649 Cane Run Road  • Louisville, KY  40211-1961

(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624

visit our web site:

www.zoeller.com

®

Your Peace of Mind is Our Top Priority

 

®

* Effluent systems should specify that pumps should not handle solids exceeding ¾” in order to prevent large solids from entering leeching fields, mound systems, etc.  (Model 49 

and 70 Series have 3/8” solids capability.  50, 90, 140, 145/4145, 151, 371 and 372 Series have ½”, 130 Series has 5/8”, 152, 153 and 160/4160/180/4180 and 373 models have ¾”.)  

Where code permits, sewage pumps can be used for effluent systems.  Non-automatic pumps with external-level controls are recommended for septic tank effluent applications.

Содержание 137 Series

Страница 1: ...lified licensed electrician 9 Pump installation and servicing should be performed by a qualified person 10 Risk of electric shock These pumps have not been investigated for use in swimming pool and marine areas 11 According to the state of California Prop 65 this product contains chemicals known to the state of California to cause cancer and birth defects or other reproductive harm 1 Check to be s...

Страница 2: ...ervice Stations Go to www zoellerpumps com servicestations to find the Authorized Service Station in your area SERVICE CHECKLIST EASY DO S DON T S FOR INSTALLING A SUMP PUMP 1 DO read thoroughly all installation material provided with the pump 2 DO inspect pump for any visible damage caused by shipping Contact dealer if pump appears to be damaged 3 DO clean all debris from the sump Be sure that th...

Страница 3: ...under Caution on front page Water stream will be visible from this hole during pump run periods 5 Securely tape or clamp power cord to discharge pipe clear of the float mechanism s 6 Use full size discharge pipe 7 Basin must be in accordance with applicable codes and specifications 8 Pump must be level and float mechanism s clear of sides of basin before starting pump 9 Basin must be clean and fre...

Страница 4: ...rrect switching of any two power leads other than ground should provide the proper rotation All three phase pumps require motor starting devices with motor overloadprotection SeeFM0486forduplexinstallations Pumps must be installed in accordance withtheNationalElectrical Code and all applicable local codes and ordinances Pumps are not to be installed in locations classified as hazardous in accordan...

Страница 5: ...e o las bom bas no automáticas que usan interruptores de flotador de nivel variable auxiliares es responsabi lidad del instalador y deberá verificarse que el interruptor de flotador atado no se enganchará en el aparato de la bomba ni en las peculiaridades del foso y que está fijado de manera que permita la parada de la bomba Se recomienda usar tubería y empalmes rígidos y que el foso tenga 45 cm 1...

Страница 6: ...sumidero 6 INSTALE una válvula de retención y una unión en la tubería de descarga JAMÁS use una tubería de descarga de menor tamaño que la descarga de la bomba 7 JAMÁS use una bomba de sumidero como una bomba excavadora o para zanjas ni para bombear aguas cloacales gasolina u otros líquidos peligrosos 8 PRUEBE la bomba inmediatamente después de su instalación para asegurarse de que el sistema func...

Страница 7: ...MATICAS UTILICE EL ESQUEMA PARA LA INSTALACION PARAACHIQUE MÁS ABAJO 12 Los sellos herméticos contra gases son necesarios en todas las instalaciones de aguas cloacales a fin de contener los gases y olores 13 Ventile los gases y olores a la atmósfera a través del tubo de ventilación sólo para cloaca y achique 14 Instale el soporte para bomba Zoeller Modelo 10 2421 debajo de la bomba para proporcion...

Страница 8: ... posee un tomacorriente de este tipo se debe cambiar por uno apropiado cableado y con puesta a tierra de acuerdo al Código Eléctrico Nacional y a todas las ordenanzas y códigos locales aplicables ADVERTENCIA Riesgo de choque eléctrico No quite el cable de alimentación eléctrica ni el dispositivo de alivio de tensión y no conecte un conductor directamente a la bomba ADVERTENCIA La instalación y ver...

Страница 9: ...oits classifiés à risque conformément à la norme ANSI NFPA 70 du Code national américain de l électricité 7 Risque d électrocution Ne pas enlever le cordon d alimentation ni le distributeur de tension mécanique ni brancher le conduit directement à la pompe 8 L installation et la vérification de l équipement électrique doivent être faites par un électricien qualifié 9 L installation et la vérificat...

Страница 10: ...oir d autres droits qui varient d une province à l autre GARANTIE LIMITÉE Le fabricant garantit à l acheteur et au propriétaire ultérieur pendant la période de garantie tout produit neuf contre tout vice de matériel et de main d œuvre en utilisation normale et quand utilisé et entretenu correctement pendant une période de 3 ans de la date de fabrication initiale Les pièces devenant défectueuses pe...

Страница 11: ...r un tuyau de refoulement de pleines dimensions 7 Le puits doit être conforme à tous les règlements applicables 8 Avant la mise en service la pompe doit être de niveau et le mécanisme du flotteur ne doit pas toucher les bords du puits 9 Après l installation le puits doit être propre et ne doit pas contenir de débris 10 L installateur doit fournir la vanne d arrêt et l installer en respectant tous ...

Страница 12: ...nu dans les limites appropriées Remarque Le câble doit être installé horizontalement Longueur du bras d attache Plage de pompage 5 10 15 20 22 9 13 5 18 22 24 5 po min 22 po max SK305 Interrupteur 20 amps modèles WD et WH min max 011835 VERT NOIR MOTEUR BLANC COMMUTATEUR DE FLOTTEUR BLEU ROUGE JAUNE NOIR EXÉCUTENT DÉMARRENT NOIR BLANC CONDENSATEUR DE PASSAGE BLEU BLANC ROUGE BRUN O L Instructions ...

Отзывы: