
Content
Page
Declaration of Conformity
Handover Declaration
1.
Introduction .................................................................................................................. - 27 -
2.
The Prevention of Accidents and Damage ................................................................... - 27 -
3.
The Integration of the Dosing Unit into the Process Chain ......................................... - 28 -
4.
Mounting of the Nozzle Fixtures ................................................................................. - 29 -
b)
Mounting of the Tensioning Strips ........................................................................... - 30 -
5.
Electrical Connection of the Unit ................................................................................ - 31 -
6.
Connection of the Acid Vessel .................................................................................... - 31 -
7.
The Dosing of the Acid ................................................................................................ - 32 -
a)
Determination of the Moisture content of the Grain ................................................ - 32 -
b)
The Application Quantity of the Propionic Acid dependant of the Storage Period . - 32 -
c)
Conveying output of the Output Worm Conveyor ................................................... - 32 -
d)
Determination of the Acid Quantity ......................................................................... - 32 -
e)
The Selection of the Nozzle Size ............................................................................. - 33 -
f)
Example for the correct Preparation ......................................................................... - 33 -
8.
Initial Commissioning of the Unit ............................................................................... - 34 -
9.
Setting of the Dosing Quantity .................................................................................... - 36 -
10.
Shutting Down the Unit ............................................................................................ - 37 -
11.
Maintenance and Care .............................................................................................. - 37 -
12.
Possible Malfunctions and their Remedy ................................................................. - 38 -
13.
Technical Data .......................................................................................................... - 38 -
14.
Tables ....................................................................................................................... - 39 -
Table 1 ............................................................................................................................. - 39 -
Table 2 ............................................................................................................................. - 39 -
Table 3 (according to BASF) ........................................................................................... - 40 -
15.
Electric Circuit Diagram .......................................................................................... - 41 -
a.
Electric Circuit Diagram PKT 960 .............................................................................. - 41 -
b.
Electric Circuit Diagram PKT 960 .............................................................................. - 42 -
c.
Image of the Control Box ............................................................................................ - 43 -
d.
Instructions regarding the Settingss of the Relay for the worm Conveyor Motor ....... - 44 -
Spare Parts List for PKT 960 .............................................................................................. - 45 -
Содержание PKT 960
Страница 2: ......
Страница 3: ...3 ...
Страница 6: ......
Страница 48: ... 48 12 5 11 6 13 7 8 9 10 4 16 3 15 Bild 2 image 2 17 14 Bild 1 image 1 ...
Страница 49: ... 49 Bild 3 image 3 Bild 4 image 4 20 4 15 4 13 18 14 4 19 13 11 19 7 8 9 10 ...
Страница 53: ... 53 58 52 60 57 59 53 48 51 57 59 56 54 55 49 20 50 11 62 61 20 64 63 Bild 11 image 11 Bild 12 image 12 ...