206
INDEX
Lever of manual refulation of fuel
42
Lever of shifting gears
43
Lever of shifting of road and reduced gears
44
Lever of shifting of speed 540 (or 540e) and 1,000 rpm
of the rear output shaft
45
Lever of switching on rear output shaf drive
46
Lifting forc eof three-point hitch
196
Lights switcher (a)
39
Limiting pull rods
107
List of lamps
133
Loading capacity of front tyres
193
Loading capacity of rear tyres
194
Location of serial numbers
5
Locking control levers
97
Longitudinal adjustment
24
Lower pull bars with extensible terminals
109
Lower pull bars with hooks CBM
109
Lubrication and filling points of the front driving axle
168
M
Main dimensions of the traktor (mm)
188
Maintenance and care for tyres
172
Maintenance instructions
153
Maintenance of dry air cleaner – indicator of clogging
158
Maintenance of the air-conditioning (a/c) systém
171
Maintenance of the alternator
128
Maintenance of the battery
127
Manipulation with the starter
52
Maximum permitted vertical static loading of hitches for
trailers and semi-trailers
79
Maximum transferred power
84
Maximum weight of fluid (kg) according to dimensions
of tyres
123
Mixed regulation of lifting the rear three-point hitch
94
Modular system of hitches for trailers and semi-trailers
75
Moving off
61
Mudguards of the front driving axle
117
Multi-level quick-adjustable hitch CBM
74
N
Non-freezing solution for filling of tyres
123
O
Oil filling, inspection and drain holes of front wheel
reducers
168
Oil for hydrostatic steering for tractors
142
Oil for zetor engines equipped with diesel particle filter
140
Oils for front drive axle
142
Oils for front output shaft
140
Oils for tractor transmission gearing
141
Oils for tractor transmission gearing
141
Oils for zetor engine,
140
Opening of doors from inside
19
Opening of doors from outside
19
Opening of front bonnet
155
Operation of heating of air-conditioning with work of
the tractor
29
Operations carried out after every 100 hours of work
136
Operations carried out after every 50 hours of work
136
Operations carried out after every 500 hours of work
137
Operations carried out daily before beginning of work
136
Operations carried out outside the interval of 500 hours
of work
137
Outer contour and track wheeling diamater
202
Outer hydraulic circuit
95
Outer hydraulic circuit controls
96
Содержание PROXIMA PLUS 100 2012
Страница 1: ......
Страница 6: ...5 LOCATION OF SERIAL NUMBERS G2...
Страница 17: ...16 NOTES...
Страница 33: ...32 GETTING TO KNOW THE TRACTOR B21b...
Страница 35: ...34 GETTING TO KNOW THE TRACTOR F54d...
Страница 49: ...48 NOTES...
Страница 73: ...72 NOTES...
Страница 87: ...86 NOTES...
Страница 105: ...104 NOTES...
Страница 125: ...124 NOTE...
Страница 135: ...134 NOTE...
Страница 147: ...146 TRACTOR MAINTENANCE SUSPENSION FOR SINGLE AXLE TRAILER Pos No Name Number of lubr points 1 Hook pin bearings 2...
Страница 150: ...149 TRACTOR MAINTENANCE UPPER LINKAGE BRACKET Pos No Name Number of lubr points 1 Pins of upper linkage bracket 2...
Страница 153: ...152 NOTES...
Страница 175: ...174 NOTES...
Страница 210: ...209 NOTES...
Страница 212: ......