ZHDN 2500-150
Installation
17
www.zepro.com
platform.
7.
The support frame should be positioned as high as possible within the specified C dimension.
Adjust the frame to the ideal height under the trailer chassis. A car jack is useful. If necessary
you can adjust the height of the bracket by installing its upper and lower parts in an alternative
pattern of holes. See section "5 Adjusting the chassis brackets" on page 14.
If necessary
adjust the angle of the arms by carefully operating the lift.
8. Fit the support frame to the trailer chassis using the clamps. See illustration
below. Tighten the bolts using a torque wrench.
Tightening torque: 180 Nm.
Welding is not permitted on the chassis brackets.
Do not move the lift all the way to the armstops or with the platform fitted before all the
bolts are fully tightened against the chassis.
Do not place the lift under load until all bolts are tightened.
NOTE.
9. Remove the mounting jig.
Image 16. Fit the support frame to the trailer chassis using the clamps
Содержание ZHDN 2500-150
Страница 2: ......
Страница 57: ...ZHDN 2500 150 Specifications 57 www zepro com Image 64 Loading diagram 14 4 Loading diagram ...