Installation
5-4
61211-8140502
METROTOM 1500 G3 1.4
Installation
Choosing the installation site
The installation site has to meet certain requirements. The following
questions must be clarified:
–
Is the room height sufficient?
–
Is enough space available?
–
Is the floor suitable for the weight of the CT scanner and the forklift?
–
How strong are the vibrations on the installation site?
Disturbing vibrations may be caused, for example, by machines in
adjacent rooms or buildings.
–
Does the installation site comply with all the ambient conditions re-
quired for perfect operation of the CT system?
–
Is the installation site free from coarse dirt particles such as casting
sand and metal chips?
–
Are there problems with the power supply?
For more information, please refer to the »Installation Instructions«
brochure.
Installation requirements
The following preparations must be made before the ZEISS service engi-
neer installs the CT system:
You will find all of the data required for these preparations in the “Instal-
lation site requirements”.
Adaptation to room temperature (48 hours)
When installing the CT scanner, the temperature of all CT scanner parts
must be stabilized at a minimum temperature of 15°C.
–
Store all parts of the CT scanner in a storage location having an am-
bient temperature of at least 15°C at least two days prior to installa-
tion.
Содержание METROTOM 1500 G3
Страница 8: ...6Table of contents 6 61211 8140502 METROTOM 1500 G3 1 4...
Страница 18: ...Warranty 1 6 61211 8140502 METROTOM 1500 G3 1 4...
Страница 72: ...Start up checklist 6 14 61211 8140502 METROTOM 1500 G3 1 4...
Страница 104: ...Inspection measures 9 10 61211 8140502 METROTOM 1500 G3 1 4...
Страница 110: ...2Glossary 2 61211 8140502 METROTOM 1500 G3 1 4...
Страница 120: ......