Note:
the STD self-test is the same as the Fast self-test
except that the waiting times are longer (about 45
minutes for the standard self-test compared to 12
minutes for the FAST self-test).
At the end of the self-test, all eight thresholds will be
displayed with the relative values and times set and
detected.
Note: During operation in EPS mode, if the batteries are sufficiently charged, the system will be able to deliver a
maximum alternating current equal to:
•
System with one Pylontech battery: 5 A (1,100 W)
•
System with two Pylontech batteries: 10 A (2,200 W)
•
System with three or more Pylontech batteries: 13 A (3,000 W)
•
System with one or more WeCo batteries: 13 A (3,000 W)
In the event of a
power blackout
, the alternating voltage supplied by the grid will be lost; this condition will
activate the internal switches of the storage inverter which, once the set activation time has expired, will supply
an alternating voltage of 230V with a frequency of 50 Hz on the LOAD output. By energising the coils of the double
switch contactor, this voltage will cause the normally open switches to close, and the normally closed switches to
open (to prevent current being fed back into the grid, into the photovoltaic inverter and into the GRID terminal
block of the storage system which would attempt to reconnect to the grid by deactivating the EPS function), thus
supplying energy only to critical loads according to the conditions and availability of the batteries.
230V
0.00V
1.Settings
11.Self-test
1. Fast self-test
2. STD self-test
1.Settings
5.EPS Mode
1. EPS setting
2. Set start time
Enable / disable
EPS activation delay time
Before running the self-test make sure the correct country code has been set!!!
21. SELF-TEST
20.5 PROCEDURE FOR SETTING FROM THE DISPLAY