Block the CTs by pressing the arrow so that the word
FREEZE
appears at the bottom and then confirm
with the fourth button
Checks to be carried out:
Make sure that the power consumption is greater than
800W on the CTA, CTB and CTC phases by checking the
values on the display; also make sure that IMPORT is
present on each of the three phases.
NOTE
: If not, increase the consumption until the required
condition is met.
If each sensor has been correctly positioned on its
reference phase, the
PF
value (phase shift between
voltage and current) will be greater than 90% on all three
phases.
Otherwise, the value will be around 50% and an
alarm will
be signalled
< ! >
The sensors or the terminals inserted in the inverter's
terminal board will need to be moved until the value of
the Power Factor takes on the correct values.
ON
Turn on the photovoltaic system
OK
OK
OK
OK
OK
OK
NO
OK
NO
1.Settings
14.CTpv Scale Factor
“Password 0001”
Scale Factor:
1.00
→ Single-phase configuration
3.00
→ Three-phase configuration
NOTE
: The CTpv scale factor is the multiplying coefficient of the
power value read by the CTpv sensor on the phase in which it is
installed.
This value is set to 1 by default and can be modified to multiply
the power value read by the sensor.
If the required conditions cannot be checked, please contact
technical support for assistance
INSTALLATION OF THREE-PHASE SYSTEM
14.3 INITIAL SET-UP PROCEDURE OF THE 3000SP - CTpv SETTINGS AND PHOTOVOLTAIC START UP
Содержание Azzurro 3000SP
Страница 1: ...QUICK INSTALLATION GUIDE 3000SP STORAGE SYSTEM ...
Страница 26: ...22 DATASHEET ...