background image

Installation

Preparation of the machine

The  preparation  of  the  coffee  machine 
and its installation must be performed by 
qualified staff.

Starting the machine

Open  the  water  tap  of  the  water  mains 
and of the softener / water filter.

Turn the switch to position “

1

” 

(electrical power supplied to the pump for 
automatic  boiler  filling  and  machine 
services)  and  wait  for  the  boiler  to  be 
automatically filled with water.

Turn  the  switch  to  position  “

2

”  (full 

electrical  power  suppled,  including  the 
heating element in the boiler) and wait for 
the machine to warm up completely.

Wait  for  the  pressure  to  reach  its 
operational pressure 1.1÷1.3 atm
checking  the  boiler  pressure  on  the 
gauge

Should the machine fail to stabilize on the 
indicated values it is
necessary  to  calibrate  the  pressure 
switch  as  described  in  calibration 
paragraph.
Then  check  the  pressure  on  the  pump 
gauge  putting a unit into
operation with filter holder engaged filled 
with ground, dosed and
pressed  coffee  in  order  to  achieve  an 
effective working pressure of
8/9 atm.
Should  re-calibration  of  the  pump 
pressure be necessary this
operation  should  be  undertaken  as 
indicated in the “calibration” paragraph.

!

!

WARNING

Use  of  the  machine  without  all  the 
installation operations having been carried 
out by technical personnel could damage it 
seriously. 

WARNING

During  the  machine’s  warm-up  (roughly 
20 minutes), the negative pressure valve 
will release steam for a few seconds until 
the valve itself closes.
Before using the machine, run deliveries   
with  the  filter  holder  attached  for  a  few 
seconds to release any air which may be 
in the circuit, so that the head groups are 
completely heated. 

The  user  must  be  provided  with 
instructions  in  order  to  use  the  machine 
properly.  It  is  recommended  not  to  take 
actions which may disturb the functions of 
the machine.

  WHEN  THE  MACHINE  IS  SWITCHED 
ON,  ITS  BOILER  CONTAINS  STEAM 
AND WATER UNDER PRESSURE

!

!

0

1

2

Switch

Machine
OFF

Machine
ON

Prime
Boiler

6

ZagatO

TEC

Espresso Italia PTY LTD 

www.espressoitalia.com.au 

Freecall 1300 660 976

Содержание ESPRESSO COFFEE MACHINE

Страница 1: ...e we recommend to read the following instructions thoroughly which explains how to install and use the unit Instruction Manual ZagatO Macchina da Caffe Espresso coffee machine Maquina para caf expr s...

Страница 2: ...the machine in the most efficient way and how to react if malfunction will occur Store this manual carefully If you should lose it you can ask for and additional copy from the distributor Index Read t...

Страница 3: ...r question concerning specific situations or problem please contact the local dealer or manufacturer directly Power Cord Never use this unit with a defective power cord Replace defective power cords a...

Страница 4: ...5 2 5 1 0 1 5 2 5 1 2 3 7 4 4 5 6 9 10 11 8 8 12 12 0 1 2 Positioning Place the unit on a level surface Keep 5 cm of clear space from the side wall of the unit and 10 cm from the rear In order to fun...

Страница 5: ...0W 5500W Brewing Group Heads 1 2 3 Steam Wand s 1 2 2 Hot Water 1 1 1 Electronic Multiple pre brewing volume setting Auto self cleaning Temperature control 1 2 bar pressure switch for heated water out...

Страница 6: ...r engaged filled with ground dosed and pressed coffee in order to achieve an effective working pressure of 8 9 atm Should re calibration of the pump pressure be necessary this operation should be unde...

Страница 7: ...shown in the figure and on the pressure switch itself The pressure varies by 0 1 atm for every complete screw turn Pump pressure adjustment Insert the filter holder into the unit filled with regularly...

Страница 8: ...ol is preceded by pre infusion Delivery of the coffee measure after time 1 ON is suspended for a time 2 OFF and is then resumed for the completion of selection On pressing one of the volumetric contro...

Страница 9: ...ing mode no pre infusion 0 1 2 T1 T2 T3 T4T5 ON IMPORTANT The programming of every dose must be done with ground coffee and not with previously used grounds With machines having two or three groups by...

Страница 10: ...d Press buttonT5 to confirm Press buttonT5 to confirm 7 6 9 8 8 Flash Flash Flash Light Light Light Light Light T1 T2 T3 T4 T5 T5 T4 T3 T2 T1 0 1 2 T1 T2 T3 T4T5 9 Programming with pre infusion Button...

Страница 11: ...nozzles must be cleaned immediately after use in order to prevent the risk of the formation of any scale which may block the holes and to ensure that any drinks made subsequently do not absorb any un...

Страница 12: ...will compromise the quality of the coffee and will also cause problems such as bad extraction and coffee grounds at the bottom of the cup Showers The showers D should be cleaned weekly in hot water T...

Страница 13: ...T3 button Rinse out the unit using a normal filter and then undertake a few dispensing operations using water only Then prepare a coffee in order to eliminate any detergent residue Machine maintenance...

Страница 14: ...er 2 Adjust the grinder doser 1 Dirty clogged drain box 2 Drainage pipe clogged or detached 3 Other internal leakages 1 Clean the drain box 2 Replace clean the drainage pipe 3 Contact specialized pers...

Страница 15: ...ctrical connection 4 Partially burnt out element CAUSE SOLUTION 1 Contact specialized personnel 2 3 4 1 Contact specialized personnel 1 Contact specialized personnel 1 Contact specialized personnel 1...

Страница 16: ...details to the product We guarantee that these instructions reflect the actual state of the product at the moment of its sale in the market We also would like to use this occasion to invite you to of...

Отзывы: