background image

Use and programming

Once completing the programming, place 
the programming switch back in the OFF 
position.

Repeat  the  following  operation  for  the 
programming of the remaining buttons :

For  programming  with    pre  infusion   
repeat  steps 3 to 6

For programming with no pre infusion 
repeat steps 7- 8 and 5 

Programming with no pre infusion

(Buttons must be lit up, if not press T5)

Put the coffee cup under the dispensing 
spout.

Press  and  hold  the  button  to  be 
programmed  until  the  desired  dose  is 
obtained.

Press button T5 to confirm.

Press button T5 to confirm.

7

6

9

8

8

Flash

Flash

Flash

Light

Light

Light

Light Light

T1

T2

T3

T4

T5

T5

T4

T3

T2

T1

0

1

2

T1 T2 T3 T4 T5

9

Programming with pre infusion

(Buttons must  flash, if not press T5)

Put the coffee cup under the dispensing 
spout.

Press the button to be programmed and 
hold  for  as  long  as  you  want  the  pre-
infusion. (Aprox. from 1 to 3 sec) 

Wait up to 2 sec. (Infusion time) 

Press  and  hold  the  same  button  again 
until the desired dose is obtained.

4

4

6

5

5

3

T1

T1

T2

T2

T3

T3

T4

T4

T5

T5

T5

T4

T3

T2

T1

T5

T4

T3

T2

T1

10

ZagatO

!

NOTE

Programming
switch located
inside 
machine

OFF

Espresso Italia PTY LTD 

www.espressoitalia.com.au 

Freecall 1300 660 976

Содержание ESPRESSO COFFEE MACHINE

Страница 1: ...e we recommend to read the following instructions thoroughly which explains how to install and use the unit Instruction Manual ZagatO Macchina da Caffe Espresso coffee machine Maquina para caf expr s...

Страница 2: ...the machine in the most efficient way and how to react if malfunction will occur Store this manual carefully If you should lose it you can ask for and additional copy from the distributor Index Read t...

Страница 3: ...r question concerning specific situations or problem please contact the local dealer or manufacturer directly Power Cord Never use this unit with a defective power cord Replace defective power cords a...

Страница 4: ...5 2 5 1 0 1 5 2 5 1 2 3 7 4 4 5 6 9 10 11 8 8 12 12 0 1 2 Positioning Place the unit on a level surface Keep 5 cm of clear space from the side wall of the unit and 10 cm from the rear In order to fun...

Страница 5: ...0W 5500W Brewing Group Heads 1 2 3 Steam Wand s 1 2 2 Hot Water 1 1 1 Electronic Multiple pre brewing volume setting Auto self cleaning Temperature control 1 2 bar pressure switch for heated water out...

Страница 6: ...r engaged filled with ground dosed and pressed coffee in order to achieve an effective working pressure of 8 9 atm Should re calibration of the pump pressure be necessary this operation should be unde...

Страница 7: ...shown in the figure and on the pressure switch itself The pressure varies by 0 1 atm for every complete screw turn Pump pressure adjustment Insert the filter holder into the unit filled with regularly...

Страница 8: ...ol is preceded by pre infusion Delivery of the coffee measure after time 1 ON is suspended for a time 2 OFF and is then resumed for the completion of selection On pressing one of the volumetric contro...

Страница 9: ...ing mode no pre infusion 0 1 2 T1 T2 T3 T4T5 ON IMPORTANT The programming of every dose must be done with ground coffee and not with previously used grounds With machines having two or three groups by...

Страница 10: ...d Press buttonT5 to confirm Press buttonT5 to confirm 7 6 9 8 8 Flash Flash Flash Light Light Light Light Light T1 T2 T3 T4 T5 T5 T4 T3 T2 T1 0 1 2 T1 T2 T3 T4T5 9 Programming with pre infusion Button...

Страница 11: ...nozzles must be cleaned immediately after use in order to prevent the risk of the formation of any scale which may block the holes and to ensure that any drinks made subsequently do not absorb any un...

Страница 12: ...will compromise the quality of the coffee and will also cause problems such as bad extraction and coffee grounds at the bottom of the cup Showers The showers D should be cleaned weekly in hot water T...

Страница 13: ...T3 button Rinse out the unit using a normal filter and then undertake a few dispensing operations using water only Then prepare a coffee in order to eliminate any detergent residue Machine maintenance...

Страница 14: ...er 2 Adjust the grinder doser 1 Dirty clogged drain box 2 Drainage pipe clogged or detached 3 Other internal leakages 1 Clean the drain box 2 Replace clean the drainage pipe 3 Contact specialized pers...

Страница 15: ...ctrical connection 4 Partially burnt out element CAUSE SOLUTION 1 Contact specialized personnel 2 3 4 1 Contact specialized personnel 1 Contact specialized personnel 1 Contact specialized personnel 1...

Страница 16: ...details to the product We guarantee that these instructions reflect the actual state of the product at the moment of its sale in the market We also would like to use this occasion to invite you to of...

Отзывы: